If you’ve been involved in piping system design, maintenance, or procurement, you know that Orbit/Lift Type DBB (Double Block and Bleed) plug valves are non-negotiable for critical applications—think oil and gas pipelines, chemical processing plants, or refinery separator skids. These valves lock off process fluid in two separate, parallel ways and include a bleed port to vent trapped pressure between the blocks, eliminating risk of leaks or cross-contamination. But here’s the thing: a valve that looks compliant on paper might fail when pushed to its limits. As a supplier who’s lived this process for over a decade, I’ve seen too many projects cut corners on pressure testing only to end up with downtime, costly repairs, and even safety hazards. That’s why I’m breaking down how we pressure test our Orbit/Lift Type DBB plug valves the right way—no shortcuts, no guesswork, just methods that have stood up to real-world testing. Orbit / Lift Type DBB Plug Valves

First, let’s get clear on why this test matters. A DBB plug valve’s core job is to create two sealed barriers between upstream and downstream piping. If either block fails, process fluid could leak past the valve, mix with trapped medium between the blocks, or escape to the atmosphere. For example, in a refinery’s crude oil transfer line, a failed block might let raw crude seep into a low-pressure bleed line, where it could vaporize and create an explosion risk. In a chemical plant, cross-contamination between two incompatible products (like sulfuric acid and sodium hydroxide) could lead to a violent reaction. Pressure testing isn’t just a formality—it’s how we prove the valve will hold up under the exact conditions it will face in the field.
We structure our pressure testing in three distinct phases, each designed to target a different part of the valve’s function, and we never skip a step. The first phase is the Shell Test, which checks the valve’s external and internal body integrity—including the bonnet, pipe connections, and the plug valve’s outer housing. This test uses hydrostatic pressure (water-based, unless specified for specialty services) because it’s safer and more predictable than pneumatic testing for static body checks. Here’s how we execute it: once the valve is fully assembled, we plug the bleed port and one end of the valve, then fill the body completely with water to remove all air pockets (trapped air can give false pressure readings, so we bleed vents at the top of the body until water flows steady). We then apply a test pressure equal to 1.5 times the valve’s maximum rated working pressure (MAWP) for a minimum of 10 minutes. During that time, we check every weld, gasket, and pipe thread for leaks—even a faint seep around the bonnet gasket means we’re pulling the valve apart to replace the seal before it leaves our facility. For Orbit Type DBB valves, which have a split body design to simplify maintenance, this test also verifies the body halves are properly aligned, so there’s no gap that could cause external leakage.
The second phase is the Block Seal Test, which is where we validate the two core sealing barriers that make a DBB valve different from a single-block valve. For Orbit/Lift Type DBB valves, the plug is designed to either rotate into a sealing position (Orbit Type) or lift off its seat to separate from process flow (Lift Type)—we test both seal zones individually to ensure each holds pressure. For Orbit Type valves, we close the plug fully, then isolate the upstream side by plugging the downstream port, filling the upstream chamber with water, and applying 1.1 times MAWP. We hold that pressure for 5 minutes and check for leakage across the first block. Then we open the bleed port, equalize pressure between the two chambers, and repeat the test on the downstream side, holding pressure on the downstream chamber and checking for leaks across the second block. For Lift Type DBB valves, the seat relies on a spring-loaded lift mechanism to create a tight seal—this means we need to test both static and dynamic seal performance. We apply pressure to the upstream side first, holding it for 5 minutes while monitoring for seal slip or leakage, then cycle the valve open and closed three times before repeating the test. That cycle ensures the lift mechanism doesn’t bind after initial assembly, which would cause a failed seal once in service. We once had a customer request to skip the cycle test, claiming their assembly team could do it faster—and they ended up with a Lift Type valve that leaked at the seat three days after installation. That’s the kind of risk we test to prevent.
The third phase is the Bleed Port Integrity Test, which is easy to overlook but critical for DBB valves. The bleed port’s only job is to vent trapped pressure between the two blocks, so it can’t hold pressure back—if it does, that means the port is clogged, sealed improperly, or has a faulty valve. We test this by building on the block seal test: after completing the upstream and downstream block tests, we keep the intermediate chamber (between the two blocks) pressurized to 0.5 times MAWP, then verify that the bleed port opens freely to vent that pressure. We also check that when the bleed port is closed, it doesn’t leak into either block chamber. For specialty services where the DBB valve handles toxic or high-temperature fluids, we add a gas-based helium leak test to this phase: we apply helium to the intermediate chamber, then use a sniffer probe to check for leaks at the bleed port and plug seals, catching even micro-leaks that hydrostatic testing might miss. This is especially important for valves used in natural gas processing, where even a tiny helium leak translates to large amounts of escaping methane.
Now, let’s talk about variables we adjust based on the valve’s application, because a one-size-fits-all test doesn’t work. For valves intended for cryogenic services (like liquefied natural gas, LNG), we run a cold pressure test after the standard ambient-temperature tests. We cool the valve down to -196°C using liquid nitrogen, then perform the same shell and block tests. Cryogenic gaskets and seals behave very differently at low temperatures—they shrink, harden, or deform, so a seal that worked at room temperature might fail in LNG service. We once supplied Lift Type DBB valves to an LNG terminal, and the cold test revealed a small gap in the PTFE seat that would have leaked once exposed to -162°C LNG. Adjusting for temperature saved the terminal from a major safety incident. For high-temperature service (like furnace off-gas lines, where temperatures can hit 500°C+), we run a hot pressure test once the valve is heated to its maximum operating temperature, ensuring the metal body doesn’t expand enough to break seals or cause leaks.
We also document every test in detail for our customers, because pressure test results are often required for regulatory compliance. For the Shell Test, we record test pressure, duration, and any leak points found and corrected. For Block Seal Tests, we note which side (upstream or downstream) was tested, the pressure held, and the leakage rate—per industry standards, a valid DBB valve should have zero visible leakage during the block tests. For the Bleed Port Test, we confirm that the port vents freely and that the closed bleed port has no cross-leakage between chambers. All test certificates are signed by our quality control team, and we include a serial number for each valve so you can trace its test history back to our facility.
A common mistake we see from customers is attempting to test these valves in the field, rather than at the factory. Field testing often uses makeshift setups, trapped air that skews pressure readings, and doesn’t replicate the exact process conditions. For example, testing a DBB valve with compressed air (pneumatic testing) has a higher risk of explosion if a seal fails, compared to hydrostatic testing with non-flammable water. Field tests also can’t easily simulate the temperature or pressure fluctuations the valve will face in service, leading to false pass/fail results. We advise customers to have us run the pressure tests in our controlled facility, so we can catch defects before the valve is installed, which cuts down on maintenance and downtime later.
Another point to clarify: DBB plug valves are different from double block and bleed ball valves, so the pressure testing methods are not interchangeable. Orbit/Lift Type DBB plug valves rely on a tapered or segmented plug, not a full ball, so the seal contact area is different. Our test protocols are calibrated specifically to the plug design—for example, the Orbit Type’s rotating plug creates a line seal, so our block test checks that line for uniformity, while the Lift Type’s spring-loaded seat creates a face seal, so we test the seat’s flatness under pressure.

At the end of the day, pressure testing isn’t just a check on our end—it’s a promise to our customers that their Orbit/Lift Type DBB plug valves will perform when it matters. If you’re working on a project where a failed valve could lead to safety risks, regulatory fines, or costly downtime, don’t cut corners on testing. We can walk you through the right test protocol for your application, help you understand how to read our test certificates, and ensure you get a valve that meets your exact requirements. To learn more about our Orbit/Lift Type DBB plug valves and discuss pressure testing for your specific project, reach out to our team to start a conversation about your needs. We’re here to provide the reliable valves and support you need to keep your piping systems safe and functional.
Pressure Balanced DBB Plug Valves References:
API 6D: Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids
ASME B16.10: Face-to-Face and End-to-End Dimensions of Valves
MSS SP-61: Pressure Testing of Valves
ISO 14313: Petroleum and Natural Gas Industries — Pipeline Transportation Systems
Zhejiang Demelong Fluid Technology Co., Ltd.
As one of the most reliable orbit / lift type DBB plug valves manufacturers and suppliers in China, we’re featured by quality products and good service. Please rest assured to buy bulk durable orbit / lift type DBB plug valves from our factory. If you have any enquiry about customized service, please feel free to email us.
Address: No.7936, Sunshine Avenue, Oubei Street, Yongjia County, Wenzhou City
E-mail: dml@zjnsvalve.com
WebSite: https://www.cn-dmlv.com/