{"id":625,"date":"2026-11-03T12:02:27","date_gmt":"2026-11-03T04:02:27","guid":{"rendered":"http:\/\/www.donshedor.com\/blog\/?p=625"},"modified":"2026-11-03T12:02:27","modified_gmt":"2026-11-03T04:02:27","slug":"how-to-control-the-tolerance-in-injection-molding-4097-3893cc","status":"publish","type":"post","link":"http:\/\/www.donshedor.com\/blog\/2026\/11\/03\/how-to-control-the-tolerance-in-injection-molding-4097-3893cc\/","title":{"rendered":"How to control the tolerance in injection molding?"},"content":{"rendered":"<p>Hey everyone, thanks for stopping by. As an injection molding supplier, I get asked this question all the time from clients, new and old: \u201cHow do you keep tolerances so tight? I\u2019ve had parts that just won\u2019t line up, no matter what I try.\u201d It\u2019s not magic, honestly\u2014tolerance control in injection molding is equal parts prep, process tweaking, and knowing when to adjust. I\u2019ve been doing this for 12 years, and I still mess it up sometimes, but these are the things that\u2019ve kept our parts hitting specs 9 out of 10 runs. <a href=\"https:\/\/www.jctop-cnc.com\/injection-molding\/\">Injection Molding<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.jctop-cnc.com\/uploads\/47572\/small\/cnc-machined-aluminum36f3b.jpg\"><\/p>\n<p>First off, let\u2019s cut to the chase: what even is tolerance? If you\u2019re not a mold nerd, tolerance is just the \u201cacceptable range\u201d a part dimension can be. Like, if you need a hole to be 10mm, a tolerance of \u00b10.05mm means 9.95mm to 10.05mm is cool, anything outside that is a scrap or rework. Messing this up is expensive\u2014for you, and for us. A part that\u2019s just 0.1mm off can\u2019t snap into your assembly, and that delays your production. So we\u2019re all on the same page here.<\/p>\n<p>The biggest mistake I see people make is waiting until the mold is built to think about tolerance. No lie\u2014prep work before mold making is 70% of the battle. A lot of clients come to us with a drawing that just says \u201c10mm hole\u201d with a \u00b10.5mm tolerance, and that\u2019s a problem. Why? Because not every plastic material can hold that tight a range. Soft plastics, like TPE or LDPE, stretch way too easy. A 0.05mm tolerance on TPE is almost impossible without extra cost. We\u2019ve got a chart we send clients that breaks this down, but the main thing is: match your tolerance to your material. Rigid plastics, like ABS or polycarbonate, are way more consistent. We can hit \u00b10.02mm on ABS all day, but don\u2019t ask that from silicone.<\/p>\n<p>Then there\u2019s the mold itself. Duh, the mold is the core of the part. If the mold\u2019s dimensions are off, nothing else fixes it. A lot of shops cut corners on mold material to save cash\u2014we use P20 tool steel for most molds, and for tight tolerances, we even use H13. These steels don\u2019t warp as they heat and cool, so the mold cavity and core stay the same size every run. Also, we machine the mold with CNC mills that have precision of \u00b10.01mm. Cheaper shops might use EDM that\u2019s okay for rough cuts, but for tight features, it\u2019s just not consistent. We also do a \u201ctest mold\u201d before full production\u2014run 5-10 parts, measure every dimension, tweak the mold if something\u2019s off. We\u2019ve had molds that looked perfect on paper, but the cavity shrank 0.1mm when we heated it. Catch that before 10,000 parts are bad, and you save everyone a ton of money.<\/p>\n<p>Once the mold\u2019s good, the process is next. Even a perfect mold will spit out garbage if you run it wrong. The big three factors here are temperature, pressure, and cooling time. Let\u2019s start with material temperature. If you heat plastic too much, it expands, and when it cools, it shrinks unevenly. Too cold, and it doesn\u2019t fill the mold properly, leading to warped parts. We use temperature controllers that hold the barrel temp within \u00b15\u00b0C\u2014no guessing here. Same with mold temperature: if the mold\u2019s too cold, the plastic cools fast on the outside, trapping heat inside, which makes the part warp. We regulate mold temp with water lines that keep it within \u00b12\u00b0C. I\u2019ve seen shops skip this and just run cold water, and the parts come out all twisted\u2014tolerance goes out the window.<\/p>\n<p>Pressure is another big one. Injection pressure is how hard you push the molten plastic into the mold. Too low, and the part is short, with thin spots that shrink. Too high, and the plastic overfills the mold, or the mold stretches a little, so the part is bigger than it should be. We use pressure sensors in the barrel and the mold cavity that let us adjust pressure on the fly. For example, if we\u2019re making a small gear that needs a tight tooth spacing, we set the injection pressure to 800 psi, and hold pressure for 10 seconds after the mold is full. Hold pressure is key\u2014this is when you pack extra plastic into the mold to make up for shrinkage as it cools. Skip that, and the part will shrink 5-10% depending on the plastic. For ABS, that\u2019s about 0.5mm on a 10mm part\u2014easy to blow a tolerance if you don\u2019t hold pressure.<\/p>\n<p>Cooling time ties everything together. If you take the part out of the mold too soon, it\u2019s still soft, so it deforms when you eject it. If you leave it in too long, you waste time, but also, if the cooling is uneven (like one side of the mold has better water flow than the other), the part cools differently, leading to warpage. We design mold cooling lines to run along every big dimension\u2014for a 200mm long part, we have cooling lines every 50mm. That way, both sides cool at the same rate. We also do a cooling time test: leave the part in for 15, 20, 25 seconds, measure it each time, and stop when the dimensions stop changing. No guesswork, no cutting corners here.<\/p>\n<p>Then there\u2019s post-processing, which a lot of people forget. Even if the part comes out perfect, how you handle it after matters. If you stack parts too hard, or drop them, they bend. Also, some plastics absorb moisture\u2014like nylon, if it\u2019s wet, it swells. So we dry all hygroscopic plastics (nylon, PC\/ABS blends) for 4-6 hours at 80\u00b0C before running. If we skip that, the part can be 0.2mm bigger than spec just from moisture. We have dryers in every press, so that\u2019s never an afterthought. For parts that need extra tight tolerances, we do a secondary operation: CNC milling. Wait, that sounds like extra work, but if you have a part that needs a \u00b10.03mm hole on a 100mm long part, milling it after molding is way more consistent than trying to mold it that tight. We do that for clients all the time\u2014no shame in secondary ops if it gets you the tolerance you need.<\/p>\n<p>Now, common mistakes that people mess up, and how to fix them. First, tolerance stacking. If your part has 5 features each with \u00b10.05mm tolerance, adding them up means the final part can be off \u00b10.25mm. Clients don\u2019t always think about that\u2014they just give each feature a tight tolerance, but it adds up. We help them adjust the key features (like the ones that fit into another part) to have tighter tolerances, and non-critical ones to looser. That way, you get the fit you need without wasting money on unnecessary tight specs.<\/p>\n<p>Another one: shrinkage variation. All plastic shrinks when it cools, but it\u2019s not the same every run. It depends on humidity in the shop, how long the machine has been running, even the batch of plastic pellets. Our team logs every run: humidity, temp, pressure, shrinkage rate. We check that log every time we run a new batch, so if shrinkage is off 0.1mm, we adjust the hold pressure or cooling time before parts start being bad. No more guessing\u2014we\u2019ve got a history to go back to.<\/p>\n<p>And then there\u2019s the measuring part. If you\u2019re measuring parts wrong, you\u2019ll think the tolerance is off when it\u2019s just your method. We use coordinate measuring machines (CMM) for critical parts, which measure every dimension with laser precision, but for everyday parts, we use digital calipers that we calibrate every week. A lot of shops use old, uncalibrated calipers, so they\u2019re off by 0.1mm and think their parts are bad. We send a tolerance checklist to clients with every shipment, so they know exactly where and how to measure, no confusion.<\/p>\n<p>Wait, let\u2019s be real\u2014even with all this, sometimes a part is off. It\u2019s not 100% perfect, but we keep scrap rate below 2% for all our clients. If a part is outside tolerance, we pick it up, fix it, or give you a full refund\u2014no hassle. That\u2019s why we\u2019ve been working with the same 3 clients for 8+ years, you know?<\/p>\n<p>At the end of the day, controlling tolerance isn\u2019t about using the most expensive mold or the fanciest machine. It\u2019s about planning ahead, paying attention to every little detail (temp, pressure, cooling), and adjusting when things go wrong. It\u2019s also about talking openly with your injection molding supplier early on\u2014don\u2019t wait until the mold is cut to say \u201coh, I need tighter tolerances\u201d. We can help you adjust your design to make it possible without breaking the bank.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.jctop-cnc.com\/uploads\/47572\/small\/sls-printing-servicef11a4.jpg\"><\/p>\n<p>If you\u2019ve been struggling with parts that don\u2019t fit, or you\u2019re starting a new project and need to get tolerances right, hit us up to chat. We\u2019ll walk through your design, material choice, and process, and figure out a way to get the parts you need without extra headaches. Don\u2019t let bad tolerance delay your production\u2014let\u2019s work together to get it right.<\/p>\n<p><a href=\"https:\/\/www.jctop-cnc.com\/sheet-metal\/sheet-metal-machining\/\">Sheet Metal Machining<\/a> References<\/p>\n<ol>\n<li>Rosato, D. V., &amp; Rosato, M. G. (2004). Injection Molding Handbook. Kluwer Academic Publishers.<\/li>\n<li>Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide) \u2013 Sixth Edition. PMI.<\/li>\n<li>American Society for Metrology (ASM). (2019). Measurement Techniques for Precision Plastic Components. ASM International.<\/li>\n<li>Engineering Properties of Thermoplastics. (2021). Society of Plastics Engineers (SPE).<\/li>\n<li>Mold Making and Tooling Handbook. (2020). National Tooling and Machining Association (NTMA).<\/li>\n<\/ol>\n<hr>\n<p><a href=\"https:\/\/www.jctop-cnc.com\/\">Shenzhen Jingcheng Dingyi Forming Technology Co., Ltd.<\/a><\/p>\n<p>Address: 1st Floor, Building 3, Huafeng Zhenbao Industrial Park, No.137 Shihuan Road, ShiYan Town, Bao&#8217;An District, ShenZhen, PRC<br \/>E-mail: 13071475061@163.com<br \/>WebSite: <a href=\"https:\/\/www.jctop-cnc.com\/\">https:\/\/www.jctop-cnc.com\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hey everyone, thanks for stopping by. As an injection molding supplier, I get asked this question &hellip; <a title=\"How to control the tolerance in injection molding?\" class=\"hm-read-more\" href=\"http:\/\/www.donshedor.com\/blog\/2026\/11\/03\/how-to-control-the-tolerance-in-injection-molding-4097-3893cc\/\"><span class=\"screen-reader-text\">How to control the tolerance in injection molding?<\/span>Read more<\/a><\/p>\n","protected":false},"author":131,"featured_media":625,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[588],"class_list":["post-625","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","tag-injection-molding-44ad-38ca6b"],"_links":{"self":[{"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/posts\/625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/users\/131"}],"replies":[{"embeddable":true,"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/comments?post=625"}],"version-history":[{"count":0,"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/posts\/625\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/posts\/625"}],"wp:attachment":[{"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/media?parent=625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/categories?post=625"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.donshedor.com\/blog\/wp-json\/wp\/v2\/tags?post=625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}